Pump automation designed around real process behavior.

Improve pump sequencing, VFD behavior, and control logic with automation patterns that respect field constraints.

Talks to

PumpsVFDPLCSCADA

Operating chain view

1Pumps
2VFD
3PLC
4SCADA

What we cover

A focused scope before implementation starts.

01

PLC-based pump control & sequencing

02

VFD parameter tuning & energy optimization

03

Protection logic & ESD coordination

04

Integration with TAS & SCADA

Architecture

Engineered architecture, end-to-end.

1

Layer 4

ERP

Business planning, orders, inventory accounting, billing, and master data.

2

Layer 3

TAS

Loading authorization, bay workflow, driver access, and movement records.

3

Layer 2

SCADA / HMI

Operator visibility, alarm response, process status, and event history.

4

Layer 1

PLC / VFD / Safety PLC

Control execution, pump behavior, valve states, permissives, and trips.

5

Layer 0

Field equipment

The measured reality of product movement, custody transfer, and equipment state.

Pump and VFD control architecture showing TAS authorization feeding PLC logic that governs soft-start profiles, pump sequencing, and ESD interlocks, driving a duty-standby pump pair via a VFD.
Pump / VFD control architecture — energy-efficient, mechanically gentle, fully integrated.

Throttle versus VFD behavior

Throttle control

Energy and mechanical stress remain hidden without control context.

VFD-aware sequencing

Pump behavior can be tuned around process demand and equipment limits.

Scope and outcomes

What we deliver — and what it changes.

Technical work that makes pump behavior reviewable.

  • Soft-start / soft-stop logic — reduce mechanical stress and water-hammer risk during pump starts and stops.
  • Pressure / flow setpoint control — maintain stable delivery rates across varying demand and tank levels.
  • VFD parameter tuning — optimise ramp profiles, speed bands, and energy curves for each pump and product.
  • Cavitation & dry-run protection — detect and respond to low suction pressure, high vibration, and no-flow conditions.
  • Anti-water-hammer ramp profiles — protect pipelines, valves, and loading arms from pressure transients.
Show all 14 items
  • Lead/lag, duty/standby pump sequencing — balance run hours, reduce standby time, and manage maintenance windows.
  • Coordinated start/stop with TAS-authorized loadings — pump action is gated by valid TAS authorization and safety permissives.
  • Suction/discharge pressure protection — automatic response to over-pressure, under-pressure, and filter-blockage events.
  • Motor protection & MCC integration — thermal overload, phase imbalance, and earth-fault protection coordinated with the motor control centre.
  • Energy monitoring (kWh/m³) — track and trend pump energy efficiency per product, shift, and season.
  • Predictive maintenance signals — vibration, temperature, current signature, and run-hour trends.
  • VFD-to-SCADA integration — real-time speed, power, fault, and status visibility for operators.
  • Harmonic mitigation — assess and manage electrical distortion from VFD installations.
  • ESD interlock coordination — pump shutdown on safety-system command without control-system dependency.

Scénarios représentatifs

Tirés de projets auxquels nous avons participé.

Terminal côtier d'Afrique de l'Ouest

Challenge

Multiples transferts entre ordres commerciaux, contrôle de chargement et enregistrements de stock.

Solution

Mapper les événements ERP, TAS et terrain dans une vue de chaîne opérationnelle partagée.

Outcome

Une voie plus claire pour la réconciliation, les revues d'équipe et la modernisation progressive.

Dépôt intérieur d'Afrique australe

Challenge

Une équipe opérationnelle légère avait besoin d'une meilleure confiance stock et traçabilité des mouvements.

Solution

Définir les points d'entrée BulkStock™ autour des mouvements de dépôt et des contrôles quotidiens.

Outcome

Une feuille de route pratique pour la visibilité inventaire sans remplacer tous les systèmes d'un coup.

Parc de réservoirs multi-produits

Challenge

Les décisions de planification dépendaient de rapports déconnectés et de vérifications manuelles.

Solution

Modéliser les contraintes avec un jumeau numérique et exposer les signaux KPI pour les opérations.

Outcome

Une meilleure revue de scénarios avant que les changements n'atteignent les opérations en yard.

FAQ

Questions to settle before scope hardens.

Parlez-nous

Cartographiez votre chaîne opérationnelle. Nous vous montrerons où fuient le temps, l'argent et la traçabilité.

Un appel de découverte ciblé vous donne une vue pratique des systèmes, signaux terrain et transferts opérationnels qui méritent d'être traités en priorité.

Nous répondons sous deux jours ouvrables.