Skip to main content
sbridge
Wide aerial view of a refinery complex with distillation columns, sphere tanks, pipework and processing units.

Methodology

How we deliver — Assess · Design · Integrate · Commission · Optimize.

Five phases, gated, documented, standards-aware.

Talks to

AssessDesignIntegrateCommissionOptimize

Operating chain view

1Assess
2Design
3Integrate
4Commission
5Optimize

The five phases

Each phase produces deliverables you can audit.

Assess

2–4 weeks

Operating-chain audit, data-flow map, KPI baseline, pain inventory. We review how orders, authorizations, loadings, stock movements, reconciliations and safety events actually flow today — not how they are documented.

  • Assessment report with prioritized roadmap and indicative budget ranges.
  • Data-flow map showing real handoffs between ERP, TAS, SCADA, PLC and field.
  • KPI baseline for turnaround time, stock variance, reconciliation cycle and safety-event rate.
  • Pain inventory ranked by operational and financial impact.
Terminal maturity ladder showing four steps from spreadsheets through BulkStock™ to full TAS and SCADA automation, ending with Digital Twin and a far-horizon callout.
Start where you are. Grow without re-platforming.

Standards we engineer to:

API MPMS · API 2350 · API RP 14C · IEC 61508 · IEC 61511 · IEC 62443 · IEC 60079 · ATEX · MID · ISO 28000 · NFPA 30 · Shell DEP

Parlez-nous

Cartographiez votre chaîne opérationnelle. Nous vous montrerons où fuient le temps, l'argent et la traçabilité.

Un appel de découverte ciblé vous donne une vue pratique des systèmes, signaux terrain et transferts opérationnels qui méritent d'être traités en priorité.

Nous répondons sous deux jours ouvrables.